Method Statement for Total Traceability of Oxygen Piping Materials Method Statement for Total Traceability of Oxygen Piping Materials

This procedure is intended to provide guidance and establish controls to ensure total traceability of oxygen piping components back to the ...

Read more »
6:17 PM

A Worth While Walk at Changdeokgung (창덕궁) Palace A Worth While Walk at Changdeokgung (창덕궁) Palace

The essence of staying in Korea is knowing the root, traditions and culture,  of Koreans.   For short period, our head office has been ...

Read more »
1:10 AM

Method Statement fo Equipment Internal Trays Installation Work Method Statement fo Equipment Internal Trays Installation Work

This Method Statement highlights the OWNER work sequence for the assembly and installation of trays, which are to be installed on the [Proj...

Read more »
5:31 PM

Method Statement for Plumbing Fixtures Installation Work Method Statement for Plumbing Fixtures Installation Work

Pre-Installation Activities of  Plumbing Fixtures •  Ensure that all relevant documents have been approved by OWNER prior to installa...

Read more »
6:27 PM

Method Statement for Leak Testing of Underground FRP Surface Drain Line Method Statement for Leak Testing of Underground FRP Surface Drain Line

Pre-Testing Activities for Underground FRP Surface Drain Line • Ensure that all relevant documents and procedures have been approved...

Read more »
5:36 PM

Method Statement/Procedure: Hard Copper Pipe & Potable Water Line Method Statement/Procedure: Hard Copper Pipe & Potable Water Line

This Method Statement describes solders and fluxes melting below 427°C (800°F), joint design, application temperature, testing, and solderi...

Read more »
3:09 AM

Commencement of Construction Work Commencement of Construction Work

Preparation of Work Guide After Subcontractor has been selected and before work actually commences, the representative of the Subcontract...

Read more »
3:54 PM
 
OLAN DEEMS © 2013. All Rights Reserved.
Top