This procedure is intended to provide guidance and establish controls to ensure total traceability of oxygen piping components back to the ...
A Worth While Walk at Changdeokgung (창덕궁) Palace
The essence of staying in Korea is knowing the root, traditions and culture, of Koreans. For short period, our head office has been ...
Method Statement fo Equipment Internal Trays Installation Work
This Method Statement highlights the OWNER work sequence for the assembly and installation of trays, which are to be installed on the [Proj...
Method Statement for Plumbing Fixtures Installation Work
Pre-Installation Activities of Plumbing Fixtures • Ensure that all relevant documents have been approved by OWNER prior to installa...
Method Statement for Leak Testing of Underground FRP Surface Drain Line
Pre-Testing Activities for Underground FRP Surface Drain Line • Ensure that all relevant documents and procedures have been approved...
Method Statement/Procedure: Hard Copper Pipe & Potable Water Line
This Method Statement describes solders and fluxes melting below 427°C (800°F), joint design, application temperature, testing, and solderi...
Commencement of Construction Work
Preparation of Work Guide After Subcontractor has been selected and before work actually commences, the representative of the Subcontract...